Capital Project Work to be Completed

  • Whitesboro High School:

    Asbestos abatement and floor replacement
    Computer networking upgrades
    Corridor ceiling replacements
    Courtyard reconstruction
    Electronic sign at main entrance
    Elevator upgrades
    Exterior door replacements
    Improved heating in various areas throughout building
    New student lockers
    Projector and sound board replacement in auditorium
    Roof replacement
    Security camera improvements
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades, including handicap accessibility improvements
    Turf field at the Wadas Complex
    Upgrade of kitchen

    Whitesboro Middle School Campus:

    Auditorium air conditioning installation
    Computer networking upgrades
    Corridor ceiling replacements
    Electronic sign in front of school
    Elevator upgrades
    Exterior door replacements
    Handicapped lift replacement
    Improved heating in locker rooms
    Masonry wall and roof repair work
    New student lockers
    Press box remodel at Chiz Frye Field
    Projector and stage lighting in auditorium
    Roof replacement in select areas
    Security camera improvements
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades, including handicap accessibility improvements

    Deerfield Elementary:

    Asbestos abatement and floor replacement
    Computer networking upgrades
    Corridor ceiling replacements
    Replace grease trap in kitchen
    Roof replacement
    Security camera installation
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades, including handicap accessibility improvements

    Hart's Hill Elementary:

    Computer networking upgrades
    Corridor ceiling replacements
    Exterior door replacements
    Kindergarten student restroom construction
    Remove grease trap in kitchen
    Roof replacement
    Security camera installation
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades including, handicap accessibility improvements

    Marcy Elementary:

    Asbestos abatement and floor replacement
    Computer networking upgrades
    Exterior door replacements
    Improve heat and insulation in corridor to schoolhouse
    Playground surface replacement
    Replace grease trap in kitchen
    Replace wall covering in cafeteria
    Roof replacement
    Security camera installation
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades, including handicap accessibility improvements

    Westmoreland Road Elementary:

    Asbestos abatement and floor replacement
    Computer networking upgrades
    Corridor ceiling replacements
    Library carpet replacement
    Replace grease trap in kitchen
    Roof replacement
    Security camera installation
    Sidewalk, pavement, and concrete curb replacement
    Student restroom upgrades, including handicap accessibility improvements
    Window repairs

    Maintenance Garage:

    Oil/Water separator
    Pole barn construction

    Transportation Garage:

    Building and safety upgrades
    Bus lift replacement
    Restroom upgrades, including handicap accessibility improvements
    Soil evaluation and remediation